NASA delayed the launch of its colossal next-generation Space Launch System (SLS) rocket, as an engine bleed issue forced the agency to scrub its plans.
The launch director halted the Artemis I launch attempt at approximately 8:34AM ET. SLS is a key component of NASA’s Artemis program, which aims to send humans back to the Moon by 2025. The massive rocket will carry the Orion crew capsule, which aims to carry its first astronauts in 2024.
“Launch controllers were continuing to evaluate why a bleed test to get the RS-25 engines on the bottom of the core stage to the proper temperature range for liftoff was not successful, and ran out of time in the two-hour launch window,” the agency said...
from The Verge - All Posts https://ift.tt/bPxv3l0
Comments
Post a Comment